Infrastructure

Posts tagged 'Infrastructure'

Case Study

(Case Study) LGH Equipment Contributes to Oosterweel Link Project in Antwerp, Belgium

As part of the Oosterweel link, the Flemish government wants to significantly improve the accessibility of both the city of Antwerp and the port.   During the first phase of this project (civil works on the left bank) we supplied our customer Ergon with hand chain hoists up to 20 tonne, 12 tonne shackles. lever […]

Read More
Case Study

Working on infrastructure

Our customer Hapo hoisted 2 bridge parts from their floating sheerlegs and mounted them on the rest of the bridge. It is part of a project that will take 5 to 6 years. This bridge is destined for Calais in France. The Modulifts supplied by Menno Pors on behalf of LGH were used as 1 […]

Read More
News

LGH actively involved in infrastructure works

In Germany, many infrastructural works are currently under way. We are contributing to this with our equipment and expertise. This is also the case in Hamburg where our customer Thömen Spedition GmbH & Co. KG was given the challenge of installing a temporary pedestrian bridge. The Berliner Tor metro and railway station in Hamburg has […]

Read More
Case Study

Lifting a 48T bridge on to a pontoon

Location Netherlands The challenge The Steenhuisenbrug (a 48T bridge) is being refurbished and that’s not happening on site. The bridge will be disconnected and replaced by a temporary pedestrian bridge. The bridge will then be moved to another location to undergo its refurbishment. The challenge lies in the fact that the location is in a […]

Read More