LGH Case Studies
Every LGH case study tells a story of innovation and determination. From sliding a 536T steel bridge section into place, to replacing a hydroelectric turbine generator, to delicately positioning priceless works of art, we thrive on a challenge.
Ready to be inspired? Explore our case studies and see how LGH can elevate your next project to new heights! Your success story starts here.
Installing a Cyclotron
Location Belgium, Leuven The challenge Both the weight of the cyclotron (55T) and the location, bunker not accessible from...
Read More
Reef Infra
Reef Infra Sjors Peeters, Foreman at Reef Infra: “We simply do not have sufficient call for an electrical wire rope...
Read More
Xervon Energy
Rudolf Drescher, Senior Site Manager at XERVON ENERGY: “During assembly of the waste heat steam generator, our collaboration with LGH...
Read More