LGH Case Studies
Every LGH case study tells a story of innovation and determination. From sliding a 536T steel bridge section into place, to replacing a hydroelectric turbine generator, to delicately positioning priceless works of art, we thrive on a challenge.
Ready to be inspired? Explore our case studies and see how LGH can elevate your next project to new heights! Your success story starts here.
Frame at an angle
THE CHALLENGE Our client was commissioned to lower a number of tubes with a plastic casing into a drill pipe...
Read More
Distributing weight by using our Multi Lugs
A customer of Condor Heavy Services was going to make some final adjustments to some castings. These weigh 116T each...
Read More
Work on the station Driebergen
Jos van den Bersselaar Construction BV worked at the station in Driebergen. They hired 6 lever hoists and 10 beam...
Read More
The debut of the SL100 system in Antwerp
At our customer HEAVY LIFTING + HANDLING NV we worked with our SL100 system. Davy Kraft was at the location...
Read More
Stator removal at Rugeley Power Station
Location Ridderkerk, Netherlands and Rugeley, UK Our colleagues in the UK received the request to remove a stator from a...
Read More
Assisting in placing 2.500T floodgate
Location Belgium The challenge In Belgium, a major renovation is underway at the Pierre Vandamme lock, the entrance to...
Read More
Riga Mainz
Riga Mainz Kathrin Marx, Project Manager at RIGA MAINZ: “This type of freeway lift is always complex and requires a...
Read More
Balcke-Dürr
Balcke-Durr Peter Krebs, Project Manager at Balcke-Dürr GmbH: “The LGH equipment pool has proven its worth once again! If LGH...
Read More
CASE STUDY: EUROPE’S LARGEST LED CUBE
Location Germany The challenge Ledcon was commissioned by Hisense, one of the main sponsors of the 1st league Schalke...
Read More
Weighing a Ship
Location Netherlands, Krimpen aan den Ijssel The challenge In November 2018 we were able to help weigh a yacht...
Read More