Case Study

Big Rigging Setup in Port of Antwerp

We were given the chance to provide lifting equipment for a hose tower in the Port of Antwerp. We worked with several companies to provide a proper lifting solution. The hose tower itself weighs around 315T and our equipment itself around 40T.

The hosetower is hanging below:
– 2x modular lifting beam of 400T on 14m
– 2x modular lifting beam of 250T on 15m
– 2x modular lifting beam of 110T at 9.5m
– 2x modular lifting beam of 110T at 9m
– 8x modular lifting beam of 50T on 5m
– 48 slings
– 80 shackles

All of our spreader beams are from our trusted partner Modulift.